Rao, Prakash B and Cherian, Jacob and Jeremiah, Leon (2015) Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects. Journal of Construction Engineering, Technology and Management, 5 (3). pp. 1-5. ISSN 2347-7253
![]() |
PDF
BPR+Jacob JOCTEM(STM)-2015.pdf - Published Version Restricted to Registered users only Download (610kB) | Request a copy |
Abstract
This paper focuses on how Earned Value (EV) and Earned Schedule (ES) is used for schedule analysis to monitor the progress and forecast important information in schedule; well before it is too late to make any corrective changes. Two case studies are adopted here. Using Earned Value, its monthly performance is computed along with project completion date is forecasted. The reliability of the two methods is compared using correlation analysis between the two case studies and it is seen that the dependency between the earned schedule variables between the two case studies are higher than that of the earned value ones.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Earned value, Earned Schedule, Schedule analysis, reliability, correlation |
Subjects: | Engineering > MIT Manipal > Civil Engineering |
Depositing User: | MIT Library |
Date Deposited: | 15 Jul 2015 09:45 |
Last Modified: | 15 Jul 2015 09:45 |
URI: | http://eprints.manipal.edu/id/eprint/143382 |