Analysis of Factors Which Cause Delay in Road Construction Projects In Mysuru Region, India

Hebbar, Sunith and Kumar, Kiran M (2017) Analysis of Factors Which Cause Delay in Road Construction Projects In Mysuru Region, India. International Journal of Control Theory and Applications, 10 (6). pp. 119-133. ISSN 09745572

[img] PDF
2421.pdf - Published Version
Restricted to Registered users only

Download (637kB) | Request a copy
Official URL: http://serialsjournals.com/articles.php?volumesno_...

Abstract

Managing a road construction projects in India are highly complex and are affected by various constraints. Numerous problems arise on a daily basis in the road construction sector, which are attributed to delays. Identifying these delays which are significantly influencing the projects and sorting it based on its importance is of great use in planning and managing the projects. Thus, the focus of this paper is to identify, rank, and assess the major delay cause factors in road construction projects based on the perception of the contractors who are involved in road constructions in the Mysore region, India. The data required for analysis was collected using a questionnaire survey among the contractors (82 responses). The identified delay cause factors and sub-delay factors were arranged in a hierarchical structure, which was then prioritized using two distinct methods viz. Analytic Hierarchy Process (AHP) and Relative Important Index (RII).

Item Type: Article
Uncontrolled Keywords: Analytic Hierarchy Process, Relative Importance Index, Delay Causes Factor, Road Construction
Subjects: Engineering > MIT Manipal > Humanities and Management
Depositing User: MIT Library
Date Deposited: 19 Apr 2017 04:54
Last Modified: 19 Apr 2017 04:54
URI: http://eprints.manipal.edu/id/eprint/148726